Friday, March 16, 2012

FNSI

Its the Friday Night Sew In tonight so I am working on
getting everything ready to participate.

I am working on a UFO tonight, I just have the centre block to
applique then I can put it together

SO I have cut out 16 desgran plates and the centre circle


then I need to make 4 baby dresdan flowers, stems and leaves


and of course Henrycat had to assist




what the finished quilt will look like


and Henry testing out the centre


he is lucky I love him :)



Wednesday, March 14, 2012

Sidetracked.....

But I did finish Em's quilt before I got sidetracked

see


I finished it late last night, folded it up and popped it into
the linen cupboard, after she went to school today I put it on her bed

she was very suprised this afternoon



My Pies and Tarts all finished


1 block left of my New York Beauty I was supposed to do it today


but this is what sidetracked me,


a little quilt,

Civil war Basket Quilt

all I need to do is stitch the binding down......

I love it and can't wait to make the next one :)

I joined Katheen Tracy's Small Quilts yahoo group
this is March, I am waiting for a book to arrive so I can
make January and February's quilts...

Hurry up postman!

Getting my haircut tomorrow and in the afternoon I wil get the last
NYB block done.


Tuesday, March 13, 2012

Progress Reports

Progress  Report # 1

I went and spoke to Imogens teacher yesterday and
I am thrilled to say that my
sensitive, gentle, quiet little bean took it upon
herself to speak to him, without me there
he has spoken to 1 of the boys concerned
and still needs to speak to the other, in a hurry
because she told me today he and another 2 boys
were bullying her again today, so she went and told
her teacher again, hopefully there will be some
consequences this time.


Progress Report # 2.

I am offically EXCITED actually beyond
EXCITED

we are moving house.....to the other side of town
to the House on the Hill

the Harbour Masters house becomes vacant next month
and we are moving in.

YIPPEE

Progress Report # 3

I am still sewing down binding on
Em's quilt, it seems to be taking soooooo
much longer than any other quilt

but I must keep going, I promised dh
I would have it finished before he gets home on
Thursday

He is at The Australian Maritime College
doing a refresher course in the Ship Simulator

lucky bugger is staying at my mum and dads too

Hopefully the binding will be finished tonight
tomorrow I will share a photo and share the next
New York Beauty block I did today.


Monday, March 12, 2012

2 OPAM finishes

Yes TWO quilts are finished

that means I have 1 possibly 2 sneaky nights of binding left

and my to do list is done....for now


Now I am no professional quilter, but I will have a bash, on MY quilts
to get the hang of other designs instead of just stippling every quilt I do

In My Garden was my victim,






I love the dodgy design I used on the border



LOVE that design


and hindsight is wonderful I SHOULD have stitched in the ditch
around all the applique blocks BEFORE I quilted it, but that would have left
me with the how do I get it on the frame correctly dilemma, but its finished
its 100% made by me and I love it

and my Pies and Tarts

LOVE IT 


As soon as the quilt holder uperers are home from school, I will share
full photos, I have to go and see Miss I's teacher today as she is
being bullied and it needs to stop.

She is very sensitive and takes things to heart and I don't need these
2 boys destroying what little self confidence she has in herself

wish me luck....

Friday, March 9, 2012

Finally

I cleared off Franks table



Ironed the wadding bond stuff onto my 2 pieces of wadding
love that stuff



made sure the backing fabric I dug out of my stash would suit, ironed
the backing and the P&T top


found some Rasant thread to match the top and the backing


LOVE all the circles on the back of the top


fought for an hour to get it all onto Frank the CORRECT way
took me 2 attempts

and decided just to stipple it, I love to stipple



mid way through quilting


I had it finished in 2 hours, broke 1 needle, used 4 bobbins of thread
and a said a few unladylike words :)

now I am ready to tackle In My Garden, its on Frank ready to go
I am going to use the same thread for quilting I used on the
Pies and Tarts



I can see a big OPAM tally happening, once the P&T and
In My Garden are quilted and bound, I have to stitch the binding
onto Miss Em's quilt, she has been so patient, and I want to suprise her
with it all finished and on her bed so it will be sneaky night time stitching
sessions when she is asleep until its done

fingers crossed its a 3 quilt finish for me :)

Thursday, March 8, 2012

New York Beauty

Block 1 is finished


I am not sure about the black I think I should have used a
darker Batik but I am happy with
how its turned out

Bring on block 2






Surfs Up

& its raining again

 the naughty puppy is loving it, he is  inside today!

I had to get a few things from the supermarket, so I took my camera
and drove to 'our' beach, a 300m walk from our house

this is what I found

no beach left, we walk the naughty puppy here each day
(if its not raining) and I watched the waves wash over
the embankment taking dirt back with it.


this is where we take the girlies swimming, usually its very calm and protected
and hubby dives around that rock thats poking out


then I went to Aislings Beach

the surfs up




another of hubbys dive spots


no beach at Aislings today either


I am heading to my sewing room today to finish my New York Beauty blocks

then sew some more Granny Squares.

Hubby is going to help me load my Pies and Tarts onto Frank at
lunchtime, I would like to make a start on that today too.

luckily it is PERFECT SEWING weather :)