Showing posts with label Park Avenue quilt. Show all posts
Showing posts with label Park Avenue quilt. Show all posts

Friday, December 9, 2011

Some finishes

Park Avenue is now washed, dried and
on my bed and I LOVE it.




5 drawstring party bags


see the lining, I HAD 5 metres of that fabric yesterday, then a girlie
decided to empty the rubbish in my sewing room and because
a corner of that fabric was in the bin, she BINNED all 5 metres
and I found out AFTER the bin had been emptied.....

bugger

and my finds at the reject shop yesterday

$5 each, we love them







and my 3 2 wise Santa's, the 3rd had a run in with
Henry last year...and our Reindeer


and in case you have forgotten its



Thursday, December 8, 2011

Another Finish

Park Avenue is finished

its just had a wash

and now is having a tumble in the dryer

and my quilting stood up to the washing machine YIPPEE

Its been a busy day for me.

After I dropped the girlies at school
I headed to Bega (40 minute drive) to get the Christmas
shopping done, and I got everything on
their lists, but need to get a couple of things for
Emma and Webby

Not one of the girlies asked for anything HUGE
I think the most expensive present they all
ask for was a DS game which I pre ordered
and lucky I did, when I picked them up they
told me that there were none availble in Aus until
after Christmas

They will all be happy girlies on Christmas morning.

Then I raced home unpacked the shopping and
went to school for Imogens Christmas concert.

After that I did the groceries, came home unpacked them
had lunch went to dh work to organise a Christmas BBQ here for his 2
workmates and their families for Sunday.

Stopped and got some fuel, picked the girlies up from the
bus, home for 1 hour, then off to scouts,

back to the supermarket for fruit and vege and some
christmas treats for the kids on Sunday

home again, half made some drawstring bags for the
kids treats for Sunday

Back to scouts to collect the girlies

home to get dinner, showers, some tv then bed for the girls

I got the last of the binding stitched down

quilt in the wash and dryer

kitchen cleaned

and I am exhausted

I am looking forward to Webby coming home on Saturday
he has been in Brisbane for work since Sunday and I had forgotten
how hard 3 girlies on your own can be

and you know I miss him, its the longest we have been apart for 14 weeks
and its very very quiet without him, and I miss having coffee every
morning at work or the coffee shop

2 more sleeps yippee



Wednesday, December 7, 2011

354 inches

of binding to stitch down on the Park Avenue
quilt, no pressure at all lol

My plan for today was to sit watch movies and stitch binding

BUT

I got distracted as I do and instead I made a

thread catcher bag for the quilty beast


and a huge pincushion


and together


and thats  all the stitching I have done today
but I did watch my movies while I sewed

I have cleaned the house, returned the dvd's, got chicken
wings marinating for dinner, and I picked up a
parcel at the PO and had another
delivered to the front door

and neither of them were SSCS parcels...

I am off to Bega tomorrow to get some Christmas shopping
done before the girlies finish school which is next Friday :(

I have my list, I just hope I can get what they want

and big excitement

Gumdrops and Frumpa are coming for a holiday

in Febuary lol, for 2 weeks

YIPPEE and ds will be here early Feb for a holiday too

we will definately have a full house

and my tension issues when quilting is 100%
DRIVER ERROR, it would appear you cannot
quilt as fast as you sew.........

so I slowed my sewing machine down, slowed myself down,
fiddled with the tension settings on my machine
and woo hoo tension issues sorted....I think

and Sarah yep you were right......I suppose an instruction manual is
there to be read lol not filed away




Monday, December 5, 2011

Its beginning to look alot like Christmas

Saturday night the girlies were given the job of

decorating our Christmas tree


and I hung our Christmas quilts up

A Christmas Story in the loungeroom


Tis the Season on the stairs


Today I hung our garland up on the stair banister
(looked much better hanging on our mantlepiece in Tas)


lighty decorated with 3 angels, 3 red baubles
and 3 apples


and Henrycat kept a very close eye on me today
from his  the ironing board


while I tried to quilt Park Avenue I am having tension issues
on the back.......driving me crazy


and if you look very closely


you can see I made it to the bottom border,
tomorrow it will be finished  I still have to quilt all
the dark triangles on each side.


Friday, December 2, 2011

Its Almost Finished

Park Avenue this morning


making the extra centre blocks


Ta da, still needs the top and bottom borders sewn on
4 corner blocks to make
  

and the colour is a bit off due to the lighting in my
bedroom


and I have moved Henrycat off the ironing board well
I have no idea how many times today


Hopefully tomorrow I'll get the final blocks made, borders on
and on the quilty beast BEFORE dh flies to Brisvegas
for work on Sunday.


Tuesday, November 29, 2011

Park Avenue

is the name of the UFO I am now trying
to finish, using delious Park Avenue by
3 Sisters for Moda.

It has been in this state for MONTHS.....

This is what I have to deal with


and what it should look like when finished


I now have 43 Civil War blocks done



so that means I have until Saturday to get the remaining 5 blocks done.

Very do-able I think

Tonight I am going to start block 6 of

In My Garden, Love making this quilt

and only 3 blocks to go after #6 is finished :)




Sunday, November 27, 2011

36

Civil War quilt blocks are
now completed

Yesterday the weather man was spot on

we got 57 mm's of rain in just under 24 hours

perfect stitching weather

the girlies watched movies

I got to sew ALL DAY


sorry about the 2 photos but this is what my design wall
looks like at the moment and blogger won't post them
side by side for me :(

I need to change the 2nd row # 6 block
the background needs to blend in a
bit more, atm it sticks out.

Today was a gorgeous if not windy day
so
I weeded a garden bed today and we now have a
small vege patch with

sweetcorn
2 x chillies
2 x capsicum
snow peas
lettuce
bok choy

and then in another bed we have 4 different varities
of tomatoes.

I have also finished block 5 of
In My Garden

I am just adding the fence 'rails and nails'
the palings are all done and so is the gate

Friday night I stitched all the embroidery on the other 4
blocks, and added the needleturn bits that hadn't been done

dh printed some patterns for me at work yesterday
I also found the pattern online for a quilt I started at the begining
of the year, using yummy Park Avenue fabric, the original pattern went awol
in the move so I printed it
off and tomorrow will pull out all my bits and see where I am
up to, after the house gets a good clean between the rain, the dog
and the kids its much needed :)